Power Division

Fibre Network Design & Planning Services

At CA Group, our planning side of the business specialises in providing end-to-end surveying, planning, and design services tailored for telecommunications networks, ensuring seamless and efficient project execution. Our expertise spans civils, cabling, splicing, and infrastructure design, supporting both new builds and existing network modifications across the UK.

Key Design Capabilities:

1. Diversionary Works Management

  • Full responsibility for planning and executing diversionary works across the UK.
  • Desktop and on-site surveys to assess impact and determine cost-effective solutions.
  • Creation of detailed design plans and work instructions for civil engineering teams.
  • As-built documentation for record-keeping and project closure.

2. A-B End Network Design

  • Survey, planning, and design for all build architecture and types, covering:
    • Business installations
    • Ethernet circuits
    • GPON & XGSPON
    • P2P Links
    • Core Cable Runs
    • MDU Sites
    • New Build developments
    • Network Expansion
  • Production of comprehensive job packs, including detailed network layouts, BOM, BOQ, CDM regulations, etc.

3. Walkout Activities & Network Verification

  • Site-based asset verification for both client and BT networks.
  • Raising A55s to ensure up-to-date design documentation.
  • Duct space analysis and network capacity planning to optimize build efficiency.

4. BT Works & Interconnect Design

  • NOI planning and execution via the BT portal.
  • Coordination of joint surveys with BT Openreach to create accurate design specifications.
  • Production of as-built documentation for interconnect network integration.

5. Developer Site & Exchange Audits

  • C3 quote audits to confirm infrastructure integrity before developer works begin.
  • Exchange site design validation and maintenance planning.
  • ODF audits for improved network record-keeping.

6. As-Built Capture & Documentation

  • Compilation of industry-leading as-built documentation, ensuring project records remain accurate.
  • Full design-to-delivery service, from feasibility assessment to final network implementation.

Why Choose CA Group for Your Design Requirements?

  • Industry Expertise: Years of experience designing and planning critical telecom infrastructure.
  • End-to-End Solutions: From initial site surveys to as-built documentation, ensuring a seamless workflow.
  • Nationwide Coverage: Strategic field presence across England, Scotland, and Wales, allowing for rapid response times.
  • Proven Track Record: Hundreds of successfully completed planning and design projects.

Working on Behalf of some of the biggest companies within the Telecoms Space –

City Fibre Logo
Colt Logo
Hyperoptic Logo

CA Telecom Operate across London and the South East, providing a broad Scope of Services to the Electrical Industry.

Non-Contestable works, having extensive knowledge and experience of project management, Civil design, LV/HV underground installations, New Build Installations, cable Diversionary works, excavation duct installation and reinstatement, substation base construction thus ensuring the delivery of cost effective solutions in a timely and safe manner.

Investment in manpower, plant, technology and management systems has enabled the company to build a well-deserved reputation for professionalism, reliability and attention to detail. Our highly skilled in-house workforce includes NRSWA, Confined Space, and Trench Support trained operatives who also possess CSCS and/or CPCS accreditation.

The company operates an integrated health, safety, quality and environmental (HSQE) management system which provides CA Telecom Construction with the framework and discipline to deliver consistently high-quality work in a safe and sustainable manner.

Road under construction
Road under construction
Road under construction
Road under construction
Road under construction
Share by: